都江堰至四姑娘山山地軌道交通扶貧項目地面及高架車站站房概念方案設計補遺及答疑文件(02號)
2022
06/15
星期三
本站
12877 瀏覽

一、補遺部分

I. Supplementary part

1、根據應徵人提問,現補充以下資料供應徵人蔘考使用:各站點橋樑總佈置圖、平面圖 、橫斷面圖及橋墩構造圖;臥龍鎮、耿達鎮總體規劃圖、百年水位資料、場坪標高。橋樑橫斷面圖中承軌梁及站臺梁爲按比例繪製,沿縱向橫斷面尺寸相同。
1. According to the questions raised by applicants, the following materials are supplemented for the applicant's reference: The general layouts, plans, cross-section profiles and pier structure maps of bridges at each 雪缘园足球比分手机版; master plans of Wolong Town and Gengda Town, water levels in a century and yard elevation. The rail-bearing beams and platform beams in the bridge cross-section profiles are drawn to scale, and the dimensions are the same along the longitudinal cross-section.

2、應徵人在編制臥龍站、耿達站方案時,應從功能佈置角度考慮車站與相鄰區域(地塊)的關係,即在車站相鄰區域考慮針對旅遊出行服務的配套內容。
2. When compiling schemes for Wolong 雪缘园足球比分手机版 and Gengda 雪缘园足球比分手机版, applicants should consider the relationship between the 雪缘园足球比分手机版 and adjacent areas (plots) from the perspective of functional deployment, that is, consider the supporting contents for travel service in the adjacent areas of the stations.

3、平面圖中有初定的站房場坪範圍,位置爲初選位置,應徵人可適當調整,但應避開區域基本農田範圍(圖中青色線)。
3. In the plan, there is a preliminarily determined area of the 雪缘园足球比分手机版 building yard and the  is the preliminarily selected . The applicant may adjust it appropriately, but should avoid the basic farmland scope in the area (the cyan line in the figure).

4、是否採用遠程開標、遠程陳述,將於6月25日通過郵件發送具體事宜,請擬應徵的單位在6月24日24時前發送應徵回執到指定郵箱(752636130@qq.com)。
4. Regarding whether remote bid opening and remote presentation will be adopted, specific matters will be sent by email on June 25. Please send the application reply to the designated email address (752636130@qq.com) before 24:00 on June 24.

5、陳述時間:8個站點總時間控制在25分鐘以內,各站點分配時間由應徵人自行確定。
5. Presentation time: The total time of the eight stations must be controlled within 25 minutes, and the time allocated for each 雪缘园足球比分手机版 is determined by the applicant itself.

二、答疑部分
II. Q&A part

(一)共性問題:
(I) Common problems:

(1)各個站點平面佈置圖中已示意場坪位置,站房位置可根據設計自行調整;站房主要功能和配套房間的控制面積需求具體開展設計時才提供,目前請按照總面積控制要求開展概念方案設計。
(1) Floor plan of each 雪缘园足球比分手机版 has indicated the yard , and the 雪缘园足球比分手机版 building  may be adjusted according to the design; as the control area needs of 雪缘园足球比分手机版 building's main functions and supporting rooms are not provided until the specific implementation of design, please implement the conceptual design according to control requirements of the total area at present.

(2)安檢後未考慮候車廳的設置:方案階段暫不考慮。
(2) The setting of waiting hall after security inspection is not considered: Not considered temporarily at the schematic stage.

(二)分站點問題
(II) Sub-雪缘园足球比分手机版 problems

1、虹口站:
1. Hongkou 雪缘园足球比分手机版:

(1)站位置可以根據需求進行調整,在前期研究過程中也考慮了在線路北側處設置高架平臺,該處無拆遷問題,只需另行徵地,也可重新考慮站房位置,可有適量的拆遷工程。
(1) The 雪缘园足球比分手机版  may be adjusted according to requirements. In the process of preliminary research, the setting of an elevated platform on the track's north side is taken into account, as only additional land acquisition is required without involving demolition. The 雪缘园足球比分手机版 building  may also be reconsidered with appropriate demolition work.

(2)站臺位置可以移動,但後期需要與主體設計單位對接具體移動方案。
(2) The 雪缘园足球比分手机版 platform may be moved, but the specific movement scheme should be docked with the main design agency subsequently.

(3)平面圖中的污水處理站、給水加壓站、混合降壓所都是永久設施。
(3) The sewage treatment 雪缘园足球比分手机版, water supply pressurization 雪缘园足球比分手机版 and mixed step-down 雪缘园足球比分手机版 in the plan are permanent facilities.

2、龍池站:
2. Longchi 雪缘园足球比分手机版:

(1)儘量按照規劃場坪範圍控制,避免改變徵地房屋,但若有充分的利用和更好的方案可以考慮調整。
(1) The scope should be controlled within the planned yard according to the planning to the maximum extent, so as to avoid changing the houses acquired. However, adjustment could be considered in case of full utilization and a better scheme.

(2)跨線設施一般情況下用地道,也可考慮天橋,天橋距離鐵路淨空需滿足限界要求,具體可在後期設計過程中與主體設計單位詳細對接。
(2) Track-crossing facilities are generally provided via tunnels. Overpasses are also considered with the clearance between the overpass and railway meeting the clearance requirements. The details may be docked with the main design agency in the subsequent design process.

(3)龍池站位置對原有道路進行了隔斷,涉及永久道路改移,改移道路詳見龍池站平面佈置圖。
(3) The Longchi Station partitions original roads, involving permanent 雪缘园足球比分手机版 of roads. See the floor plan of Longchi Station for the details of road 雪缘园足球比分手机版.

3、映秀站
3. Yingxiu 雪缘园足球比分手机版

設備用房位置可自行調整,相關區域結合站房可作爲停車、廣場或景觀使用,站房位置可不考慮上方電線影響,電線可進行遷改。
The  of equipment room may be adjusted. Relevant areas may act as parking lot, square or landscape in combination with the 雪缘园足球比分手机版 building. The 雪缘园足球比分手机版 building  may not take into account the above wires, which could be relocated.

4、耿達站
4. Gengda 雪缘园足球比分手机版

橋樑設計未考慮橋站合一。
Combination of the bridge and 雪缘园足球比分手机版 is not considered by the bridge design.

5、臥龍站
5. Wolong 雪缘园足球比分手机版

(1)主體設計單位已經將該區域的場坪進行了填築,場坪順接道路,高於百年洪水位。
(1) The main design agency has filled the yard in the area. The yard is connected to roads with the elevation higher than the level of 100-year flood.

(2)相關場坪內的配套設施及建築請結合貴單位的理解開展設計。
(2) Please design the supporting facilities and buildings in related yards in combination with your understanding.

6、鄧生溝站:
6. Dengshenggou 雪缘园足球比分手机版

(1)鄧生溝站場坪範圍可適當調整,但面積不能增大。
(1) The yard scope of Dengshenggou 雪缘园足球比分手机版 may be adjusted as appropriate without increase in the area.

(2)徵集文件中關於站臺寬度、軌道數的表述與圖紙不一致問題:以圖紙爲準。
(2) In case of inconsistency between the deion of platform width and track number in the solicitation s and the drawings: The drawings shall prevail.

7、巴朗山站:
7. Balang Mountain 雪缘园足球比分手机版

(1)文字裏程數與平面圖位置裏程不一致問題:以平面位置爲準,但站房位置可根據設計適當調整。
(1) In case of inconsistency between the text mileage and the mileage in the plan : The plan  shall prevail, but the 雪缘园足球比分手机版 building  may be adjusted as appropriate according to the design.

8、四姑娘山站:
8. Siguniang Mountain 雪缘园足球比分手机版

(1)用地範圍可根據方案調整,並結合地形考慮與既有公路的接駁方式。
(1) The land use scope may be adjusted according to the scheme, with the delivery mode with existing roads considered in combination with terrain.

(2)車站規模有限,應儘量考慮分流。
2) Due to the limited scale of the 雪缘园足球比分手机版, diversion should be considered to the maximum extent.

(3)文字裏程數與平面圖位置裏程不一致問題:以平面位置爲準,但站房位置可根據設計適當調整。中心裏程,以“12-四姑娘山車站(施工圖)”文件爲準。
(3) In case of inconsistency between the text mileage and the mileage in the plan : The plan  shall prevail, but the 雪缘园足球比分手机版 building  may be adjusted as appropriate according to the design. Center mileage is subject to the  "12-Siguniang Mountain 雪缘园足球比分手机版 (Construction Drawing)".

 

 

 

附件:2號補遺資料
Appendix: Supplementary Materials


                                     

      四川都金山地軌道交通有限責任公司

Sichuan Dujin Mountain Rail Transit Co., Ltd.